Sourcing Signal
Glass fiber and reinforcements: Import Burden by Source Country
Compare observed duty-and-freight burdens for source countries supplying glass fiber and reinforcements, from USITC DataWeb. Dollar landed-cost rankings appear only when at least two lanes have complete country-specific customs unit values.
How to read this
- Duty and international freight are additive shares of customs value: uplift = 1 + duty + freight. Missing components stay unknown; duty is not compounded onto freight.
- No comparative dollar ranking is shown unless at least two lanes have their own customs unit value, duty, and freight inputs. Complete burdens may still be compared without calling the lowest one a cheapest supplier.
- The FX tag is a short-window cost direction from the currency's recent drift, not a dollar recompute.
Source-country duty-and-freight burdens (unranked)
- null. Canada: 2.68% loaded (duty 0.89%, freight 1.79%), CAD trending flat
- null. Mexico: 2.77% loaded (duty 1.4%, freight 1.37%), MXN trending cheaper
- null. United Kingdom: 15.69% loaded (duty 11.47%, freight 4.22%)
- null. Belgium: 18.58% loaded (duty 10.94%, freight 7.64%), EUR trending cheaper
- null. Germany: 19.04% loaded (duty 11.43%, freight 7.61%), EUR trending cheaper
- null. Bahrain: 24.81% loaded (duty 7.36%, freight 17.45%)
- null. Taiwan: 25.22% loaded (duty 14.3%, freight 10.92%)
- null. India: 26.69% loaded (duty 21.06%, freight 5.63%)
- null. Egypt: 36.96% loaded (duty 4.99%, freight 31.97%)
- null. China: 65.49% loaded (duty 49.5%, freight 15.99%), CNY trending flat
Sourcing concentration
- Mexico is the largest retained source at 28.6% of total family import customs value. Retained sources cover 80.6%; their named-source HHI floor is 1360, which falls in the diversified range without classifying the omitted-source tail.
Frequently asked questions
- Why is there no dollar landed cost for glass fiber and reinforcements? No complete country-specific customs unit value is available for this family in the committed snapshot. The page compares observed duty-and-freight burdens but does not rank lanes until at least two have reported quantity, duty, and freight data.
- How concentrated is sourcing of glass fiber and reinforcements? Mexico is the largest retained source at 28.6% of total family import customs value. Retained sources cover 80.6% of family import customs value, so the named-source Herfindahl index of 1360 is a lower bound; its floor falls in the diversified band but does not classify the omitted-source tail. A concentrated map means fewer places to move volume if one lane's duty jumps.
About this data
- A sourcing-comparison indicator, not a customs quote. Duty and international freight are added over customs value; duty is not compounded onto freight. Lanes are ranked by modeled landed customs unit value only when at least two have their own reported customs unit value, duty, and freight. Missing or suppressed quantity data remains unknown. FX is a direction, not a recompute. Confirm classification and entry costs with a licensed broker.
Last reviewed 2026-10-08.