MFG Calcs Signals

How Much Do Input Costs Reach Prices?

The MFG Calcs Cost Pass-Through Index: how much of an upstream raw-materials cost move shows up in downstream fabricated-goods prices, and with what lag.

What this Signal shows

  • See how much of a raw-materials cost move reaches fabricated-goods prices, and with what lag, from producer price indexes.

Cadence, source and downloads

  • Cadence: Refreshed automatically whenever the producer price data updates.
  • A statistical relationship over BLS producer price indexes, not a causal claim or firm-level margins. Full index at /signals/cost-pass-through.
  • Free to download as Lag structure (CSV), Full index (JSON), Methodology (JSON) under CC BY 4.0.

Last reviewed 2026-10-01.