MFG Calcs Signals
Is U.S. Manufacturing Expanding or Contracting?
The MFG Calcs PMI: a free, reproducible Purchasing Managers' Index for U.S. manufacturing, built from federal hard data, not a survey. Above 50 means expansion.
What this Signal shows
- Read a free, reproducible manufacturing PMI built from public federal data, with the 50 line, the five components, the expansion or contraction streak, and a regional Fed survey cross-check.
Cadence, source and downloads
- Cadence: Refreshed automatically whenever the underlying federal data updates.
- An illustrative hard-data diffusion index modeled on the proprietary ISM and S&P Global PMIs, built from public Census, Federal Reserve, and BLS series. Full index at /signals/pmi.
- Free to download as History (CSV), Full index (JSON), Methodology (JSON) under CC BY 4.0.
Last reviewed 2026-10-01.