Tariff Monitor

Tariffs on Imports From Azerbaijan

In 2025, U.S. importers brought in $92.2M of goods from Azerbaijan across 15 manufacturing families MFG Calcs tracks, carrying an effective calculated-duty rate of 23.89%, up from 12.12% the year before. Azerbaijan's largest tracked categories: aluminum semi-finished products, heat exchange and process heating, compressors and fans. Tracked-family totals are a floor on total bilateral trade, from USITC DataWeb data.

The current reading

  • Tracked imports from Azerbaijan: $92.2M in 2025 across 15 manufacturing families, a floor on total bilateral trade.
  • Observed effective calculated-duty rate: 23.89% (12.12% the year before), reported Calculated Duties ÷ covered customs value.
  • History depth: 2 years of annual named-source boards.

Largest tracked families from Azerbaijan

  • Aluminum semi-finished products
  • Heat exchange and process heating
  • Compressors and fans
  • Switchgear, connectors, and controls
  • Internal combustion engines

Frequently asked questions

  • How much does the U.S. import from Azerbaijan? U.S. imports from Azerbaijan totaled $92.2M in customs value in 2025, across the 15 manufacturing material and equipment families MFG Calcs tracks. That is a floor on total bilateral trade. It excludes manufacturing products outside the tracked family universe.
  • What effective calculated-duty rate is observed for imports from Azerbaijan? In 2025, imports from Azerbaijan had an effective calculated-duty rate of 23.89% across tracked families. The rate is reported Calculated Duties divided by the customs value covered by those duty observations, which reflects the combined product, origin, preference and tariff mix in USITC's statistics. A year earlier the rate was 12.12%.
  • What does the U.S. import most from Azerbaijan? Among tracked manufacturing families, Azerbaijan's largest recent categories are aluminum semi-finished products, heat exchange and process heating, compressors and fans, switchgear, connectors, and controls. Each has its own live rate page linked below.
  • Is the tariff burden on Azerbaijan rising or falling? Rising: the effective rate on tracked imports from Azerbaijan moved +11.8 points year over year to 23.89% in 2025. Monthly family-level detail is on each linked family page.

About this data

  • Reference statistics derived from USITC published data. Not a customs ruling. MFN-Free and Special-rate fields describe statutory line coverage only; final entry liability requires origin, date, eligibility, exclusions and other transaction facts. Calculated Duties are statistical estimates, not a cash-collections ledger. Confirm classification, origin, program eligibility, and final entry liability with a licensed customs broker.

Last reviewed 2026-10-01.