Tariff Monitor

Tariffs on Imports From Kazakhstan

In 2025, U.S. importers brought in $88.5M of goods from Kazakhstan across 26 manufacturing families MFG Calcs tracks, carrying an effective calculated-duty rate of 9.59%, down from 13.01% the year before. Kazakhstan's largest tracked categories: titanium and tungsten, optical elements and lenses, steel pipe and tube. Tracked-family totals are a floor on total bilateral trade, from USITC DataWeb data.

The current reading

  • Tracked imports from Kazakhstan: $88.5M in 2025 across 26 manufacturing families, a floor on total bilateral trade.
  • Observed effective calculated-duty rate: 9.59% (13.01% the year before), reported Calculated Duties ÷ covered customs value.
  • History depth: 8 years of annual named-source boards.

Largest tracked families from Kazakhstan

  • Titanium and tungsten
  • Optical elements and lenses
  • Steel pipe and tube
  • Semiconductors and integrated circuits
  • Plastic semi-finished products

Frequently asked questions

  • How much does the U.S. import from Kazakhstan? U.S. imports from Kazakhstan totaled $88.5M in customs value in 2025, across the 26 manufacturing material and equipment families MFG Calcs tracks. That is a floor on total bilateral trade. It excludes manufacturing products outside the tracked family universe.
  • What effective calculated-duty rate is observed for imports from Kazakhstan? In 2025, imports from Kazakhstan had an effective calculated-duty rate of 9.59% across tracked families. The rate is reported Calculated Duties divided by the customs value covered by those duty observations, which reflects the combined product, origin, preference and tariff mix in USITC's statistics. A year earlier the rate was 13.01%.
  • What does the U.S. import most from Kazakhstan? Among tracked manufacturing families, Kazakhstan's largest recent categories are titanium and tungsten, optical elements and lenses, steel pipe and tube, semiconductors and integrated circuits. Each has its own live rate page linked below.
  • Is the tariff burden on Kazakhstan rising or falling? Falling: the effective rate on tracked imports from Kazakhstan moved -3.4 points year over year to 9.59% in 2025. Monthly family-level detail is on each linked family page.

About this data

  • Reference statistics derived from USITC published data. Not a customs ruling. MFN-Free and Special-rate fields describe statutory line coverage only; final entry liability requires origin, date, eligibility, exclusions and other transaction facts. Calculated Duties are statistical estimates, not a cash-collections ledger. Confirm classification, origin, program eligibility, and final entry liability with a licensed customs broker.

Last reviewed 2026-10-01.