Tariff Monitor

Tariffs on Imports From Benin

In 2024, U.S. importers brought in $8K of goods from Benin across 2 manufacturing families MFG Calcs tracks, carrying an effective calculated-duty rate of 0%. Benin's largest tracked categories: semiconductors and integrated circuits, transformers and power supplies. Tracked-family totals are a floor on total bilateral trade, from USITC DataWeb data.

The current reading

  • Tracked imports from Benin: $8K in 2024 across 2 manufacturing families, a floor on total bilateral trade.
  • Observed effective calculated-duty rate: 0%, reported Calculated Duties ÷ covered customs value.
  • History depth: 1 years of annual named-source boards.

Largest tracked families from Benin

  • Semiconductors and integrated circuits
  • Transformers and power supplies

Frequently asked questions

  • How much does the U.S. import from Benin? U.S. imports from Benin totaled $8K in customs value in 2024, across the 2 manufacturing material and equipment families MFG Calcs tracks. That is a floor on total bilateral trade. It excludes manufacturing products outside the tracked family universe.
  • What effective calculated-duty rate is observed for imports from Benin? In 2024, imports from Benin had an effective calculated-duty rate of 0% across tracked families. The rate is reported Calculated Duties divided by the customs value covered by those duty observations, which reflects the combined product, origin, preference and tariff mix in USITC's statistics.
  • What does the U.S. import most from Benin? Among tracked manufacturing families, Benin's largest recent categories are semiconductors and integrated circuits, transformers and power supplies. Each has its own live rate page linked below.

About this data

  • Reference statistics derived from USITC published data. Not a customs ruling. MFN-Free and Special-rate fields describe statutory line coverage only; final entry liability requires origin, date, eligibility, exclusions and other transaction facts. Calculated Duties are statistical estimates, not a cash-collections ledger. Confirm classification, origin, program eligibility, and final entry liability with a licensed customs broker.

Last reviewed 2026-10-01.