Tariff Monitor
Tariffs on Imports From Gaza Strip
In 2024, U.S. importers brought in $22K of goods from Gaza Strip across 1 manufacturing families MFG Calcs tracks, carrying an effective calculated-duty rate of 13%. Gaza Strip's largest tracked categories: aluminum semi-finished products. Tracked-family totals are a floor on total bilateral trade, from USITC DataWeb data.
The current reading
- Tracked imports from Gaza Strip: $22K in 2024 across 1 manufacturing families, a floor on total bilateral trade.
- Observed effective calculated-duty rate: 13%, reported Calculated Duties ÷ covered customs value.
- History depth: 1 years of annual named-source boards.
Largest tracked families from Gaza Strip
- Aluminum semi-finished products
Frequently asked questions
- How much does the U.S. import from Gaza Strip? U.S. imports from Gaza Strip totaled $22K in customs value in 2024, across the 1 manufacturing material and equipment families MFG Calcs tracks. That is a floor on total bilateral trade. It excludes manufacturing products outside the tracked family universe.
- What effective calculated-duty rate is observed for imports from Gaza Strip? In 2024, imports from Gaza Strip had an effective calculated-duty rate of 13% across tracked families. The rate is reported Calculated Duties divided by the customs value covered by those duty observations, which reflects the combined product, origin, preference and tariff mix in USITC's statistics.
About this data
- Reference statistics derived from USITC published data. Not a customs ruling. MFN-Free and Special-rate fields describe statutory line coverage only; final entry liability requires origin, date, eligibility, exclusions and other transaction facts. Calculated Duties are statistical estimates, not a cash-collections ledger. Confirm classification, origin, program eligibility, and final entry liability with a licensed customs broker.
Last reviewed 2026-10-01.