Tariff Monitor

Tariffs on Imports From French Southern and Antarctic Lands

In 2024, U.S. importers brought in $12K of goods from French Southern and Antarctic Lands across 4 manufacturing families MFG Calcs tracks, carrying an effective calculated-duty rate of 2.18%. French Southern and Antarctic Lands's largest tracked categories: hand tools, semiconductors and integrated circuits, valves and fluid controls. Tracked-family totals are a floor on total bilateral trade, from USITC DataWeb data.

The current reading

  • Tracked imports from French Southern and Antarctic Lands: $12K in 2024 across 4 manufacturing families, a floor on total bilateral trade.
  • Observed effective calculated-duty rate: 2.18%, reported Calculated Duties ÷ covered customs value.
  • History depth: 1 years of annual named-source boards.

Largest tracked families from French Southern and Antarctic Lands

  • Hand tools
  • Semiconductors and integrated circuits
  • Valves and fluid controls
  • Rubber materials and products

Frequently asked questions

  • How much does the U.S. import from French Southern and Antarctic Lands? U.S. imports from French Southern and Antarctic Lands totaled $12K in customs value in 2024, across the 4 manufacturing material and equipment families MFG Calcs tracks. That is a floor on total bilateral trade. It excludes manufacturing products outside the tracked family universe.
  • What effective calculated-duty rate is observed for imports from French Southern and Antarctic Lands? In 2024, imports from French Southern and Antarctic Lands had an effective calculated-duty rate of 2.18% across tracked families. The rate is reported Calculated Duties divided by the customs value covered by those duty observations, which reflects the combined product, origin, preference and tariff mix in USITC's statistics.
  • What does the U.S. import most from French Southern and Antarctic Lands? Among tracked manufacturing families, French Southern and Antarctic Lands's largest recent categories are hand tools, semiconductors and integrated circuits, valves and fluid controls, rubber materials and products. Each has its own live rate page linked below.

About this data

  • Reference statistics derived from USITC published data. Not a customs ruling. MFN-Free and Special-rate fields describe statutory line coverage only; final entry liability requires origin, date, eligibility, exclusions and other transaction facts. Calculated Duties are statistical estimates, not a cash-collections ledger. Confirm classification, origin, program eligibility, and final entry liability with a licensed customs broker.

Last reviewed 2026-10-01.