Tariff Monitor

Tariffs on Imports From Bolivia

In 2025, U.S. importers brought in $1.1M of goods from Bolivia across 10 manufacturing families MFG Calcs tracks, carrying an effective calculated-duty rate of 11.92%, up from 0.6% the year before. Bolivia's largest tracked categories: gears and power transmission, internal combustion engines, robots and automated machinery. Tracked-family totals are a floor on total bilateral trade, from USITC DataWeb data.

The current reading

  • Tracked imports from Bolivia: $1.1M in 2025 across 10 manufacturing families, a floor on total bilateral trade.
  • Observed effective calculated-duty rate: 11.92% (0.6% the year before), reported Calculated Duties ÷ covered customs value.
  • History depth: 2 years of annual named-source boards.

Largest tracked families from Bolivia

  • Gears and power transmission
  • Internal combustion engines
  • Robots and automated machinery
  • Measuring and inspection instruments
  • Pumps for liquids

Frequently asked questions

  • How much does the U.S. import from Bolivia? U.S. imports from Bolivia totaled $1.1M in customs value in 2025, across the 10 manufacturing material and equipment families MFG Calcs tracks. That is a floor on total bilateral trade. It excludes manufacturing products outside the tracked family universe.
  • What effective calculated-duty rate is observed for imports from Bolivia? In 2025, imports from Bolivia had an effective calculated-duty rate of 11.92% across tracked families. The rate is reported Calculated Duties divided by the customs value covered by those duty observations, which reflects the combined product, origin, preference and tariff mix in USITC's statistics. A year earlier the rate was 0.6%.
  • What does the U.S. import most from Bolivia? Among tracked manufacturing families, Bolivia's largest recent categories are gears and power transmission, internal combustion engines, robots and automated machinery, measuring and inspection instruments. Each has its own live rate page linked below.
  • Is the tariff burden on Bolivia rising or falling? Rising: the effective rate on tracked imports from Bolivia moved +11.3 points year over year to 11.92% in 2025. Monthly family-level detail is on each linked family page.

About this data

  • Reference statistics derived from USITC published data. Not a customs ruling. MFN-Free and Special-rate fields describe statutory line coverage only; final entry liability requires origin, date, eligibility, exclusions and other transaction facts. Calculated Duties are statistical estimates, not a cash-collections ledger. Confirm classification, origin, program eligibility, and final entry liability with a licensed customs broker.

Last reviewed 2026-10-01.