Tariff Monitor
Tariffs on Imports From Bulgaria
In 2025, U.S. importers brought in $487.1M of goods from Bulgaria across 51 manufacturing families MFG Calcs tracks, carrying an effective calculated-duty rate of 11.83%, up from 1.9% the year before. Bulgaria's largest tracked categories: copper semi-finished products, switchgear, connectors, and controls, steel bar, rod, and wire. Tracked-family totals are a floor on total bilateral trade, from USITC DataWeb data.
The current reading
- Tracked imports from Bulgaria: $487.1M in 2025 across 51 manufacturing families, a floor on total bilateral trade.
- Observed effective calculated-duty rate: 11.83% (1.9% the year before), reported Calculated Duties ÷ covered customs value.
- History depth: 2 years of annual named-source boards.
Largest tracked families from Bulgaria
- Copper semi-finished products
- Switchgear, connectors, and controls
- Steel bar, rod, and wire
- Turbines and fluid-power drives
- Aluminum semi-finished products
Frequently asked questions
- How much does the U.S. import from Bulgaria? U.S. imports from Bulgaria totaled $487.1M in customs value in 2025, across the 51 manufacturing material and equipment families MFG Calcs tracks. That is a floor on total bilateral trade. It excludes manufacturing products outside the tracked family universe.
- What effective calculated-duty rate is observed for imports from Bulgaria? In 2025, imports from Bulgaria had an effective calculated-duty rate of 11.83% across tracked families. The rate is reported Calculated Duties divided by the customs value covered by those duty observations, which reflects the combined product, origin, preference and tariff mix in USITC's statistics. A year earlier the rate was 1.9%.
- What does the U.S. import most from Bulgaria? Among tracked manufacturing families, Bulgaria's largest recent categories are copper semi-finished products, switchgear, connectors, and controls, steel bar, rod, and wire, turbines and fluid-power drives. Each has its own live rate page linked below.
- Is the tariff burden on Bulgaria rising or falling? Rising: the effective rate on tracked imports from Bulgaria moved +9.9 points year over year to 11.83% in 2025. Monthly family-level detail is on each linked family page.
About this data
- Reference statistics derived from USITC published data. Not a customs ruling. MFN-Free and Special-rate fields describe statutory line coverage only; final entry liability requires origin, date, eligibility, exclusions and other transaction facts. Calculated Duties are statistical estimates, not a cash-collections ledger. Confirm classification, origin, program eligibility, and final entry liability with a licensed customs broker.
Last reviewed 2026-10-01.