Tariff Monitor

Tariffs on Imports From New Zealand

In 2025, U.S. importers brought in $403.0M of goods from New Zealand across 56 manufacturing families MFG Calcs tracks, carrying an effective calculated-duty rate of 8.44%, up from 1.33% the year before. New Zealand's largest tracked categories: semiconductor and display equipment, transformers and power supplies, heat exchange and process heating. Tracked-family totals are a floor on total bilateral trade, from USITC DataWeb data.

The current reading

  • Tracked imports from New Zealand: $403.0M in 2025 across 56 manufacturing families, a floor on total bilateral trade.
  • Observed effective calculated-duty rate: 8.44% (1.33% the year before), reported Calculated Duties ÷ covered customs value.
  • History depth: 3 years of annual named-source boards.

Largest tracked families from New Zealand

  • Semiconductor and display equipment
  • Transformers and power supplies
  • Heat exchange and process heating
  • Turbines and fluid-power drives
  • Lifting and handling equipment

Frequently asked questions

  • How much does the U.S. import from New Zealand? U.S. imports from New Zealand totaled $403.0M in customs value in 2025, across the 56 manufacturing material and equipment families MFG Calcs tracks. That is a floor on total bilateral trade. It excludes manufacturing products outside the tracked family universe.
  • What effective calculated-duty rate is observed for imports from New Zealand? In 2025, imports from New Zealand had an effective calculated-duty rate of 8.44% across tracked families. The rate is reported Calculated Duties divided by the customs value covered by those duty observations, which reflects the combined product, origin, preference and tariff mix in USITC's statistics. A year earlier the rate was 1.33%.
  • What does the U.S. import most from New Zealand? Among tracked manufacturing families, New Zealand's largest recent categories are semiconductor and display equipment, transformers and power supplies, heat exchange and process heating, turbines and fluid-power drives. Each has its own live rate page linked below.
  • Is the tariff burden on New Zealand rising or falling? Rising: the effective rate on tracked imports from New Zealand moved +7.1 points year over year to 8.44% in 2025. Monthly family-level detail is on each linked family page.

About this data

  • Reference statistics derived from USITC published data. Not a customs ruling. MFN-Free and Special-rate fields describe statutory line coverage only; final entry liability requires origin, date, eligibility, exclusions and other transaction facts. Calculated Duties are statistical estimates, not a cash-collections ledger. Confirm classification, origin, program eligibility, and final entry liability with a licensed customs broker.

Last reviewed 2026-10-01.