Tariff Monitor

Tariffs on Imports From Côte d`Ivoire

In 2025, U.S. importers brought in $142K of goods from Côte d`Ivoire across 11 manufacturing families MFG Calcs tracks, carrying an effective calculated-duty rate of 14.91%, up from 0.55% the year before. Côte d`Ivoire's largest tracked categories: electric motors and generators, pumps for liquids, heat exchange and process heating. Tracked-family totals are a floor on total bilateral trade, from USITC DataWeb data.

The current reading

  • Tracked imports from Côte d`Ivoire: $142K in 2025 across 11 manufacturing families, a floor on total bilateral trade.
  • Observed effective calculated-duty rate: 14.91% (0.55% the year before), reported Calculated Duties ÷ covered customs value.
  • History depth: 2 years of annual named-source boards.

Largest tracked families from Côte d`Ivoire

  • Electric motors and generators
  • Pumps for liquids
  • Heat exchange and process heating
  • Bearings
  • Valves and fluid controls

Frequently asked questions

  • How much does the U.S. import from Côte d`Ivoire? U.S. imports from Côte d`Ivoire totaled $142K in customs value in 2025, across the 11 manufacturing material and equipment families MFG Calcs tracks. That is a floor on total bilateral trade. It excludes manufacturing products outside the tracked family universe.
  • What effective calculated-duty rate is observed for imports from Côte d`Ivoire? In 2025, imports from Côte d`Ivoire had an effective calculated-duty rate of 14.91% across tracked families. The rate is reported Calculated Duties divided by the customs value covered by those duty observations, which reflects the combined product, origin, preference and tariff mix in USITC's statistics. A year earlier the rate was 0.55%.
  • What does the U.S. import most from Côte d`Ivoire? Among tracked manufacturing families, Côte d`Ivoire's largest recent categories are electric motors and generators, pumps for liquids, heat exchange and process heating, bearings. Each has its own live rate page linked below.
  • Is the tariff burden on Côte d`Ivoire rising or falling? Rising: the effective rate on tracked imports from Côte d`Ivoire moved +14.4 points year over year to 14.91% in 2025. Monthly family-level detail is on each linked family page.

About this data

  • Reference statistics derived from USITC published data. Not a customs ruling. MFN-Free and Special-rate fields describe statutory line coverage only; final entry liability requires origin, date, eligibility, exclusions and other transaction facts. Calculated Duties are statistical estimates, not a cash-collections ledger. Confirm classification, origin, program eligibility, and final entry liability with a licensed customs broker.

Last reviewed 2026-10-01.