Tariff Monitor

Tariffs on Imports From Cayman Islands

In 2025, U.S. importers brought in $616K of goods from Cayman Islands across 15 manufacturing families MFG Calcs tracks, carrying an effective calculated-duty rate of 9.4%, up from 3.28% the year before. Cayman Islands's largest tracked categories: batteries and storage cells, measuring and inspection instruments, filtering and separation equipment. Tracked-family totals are a floor on total bilateral trade, from USITC DataWeb data.

The current reading

  • Tracked imports from Cayman Islands: $616K in 2025 across 15 manufacturing families, a floor on total bilateral trade.
  • Observed effective calculated-duty rate: 9.4% (3.28% the year before), reported Calculated Duties ÷ covered customs value.
  • History depth: 2 years of annual named-source boards.

Largest tracked families from Cayman Islands

  • Batteries and storage cells
  • Measuring and inspection instruments
  • Filtering and separation equipment
  • Switchgear, connectors, and controls
  • Pumps for liquids

Frequently asked questions

  • How much does the U.S. import from Cayman Islands? U.S. imports from Cayman Islands totaled $616K in customs value in 2025, across the 15 manufacturing material and equipment families MFG Calcs tracks. That is a floor on total bilateral trade. It excludes manufacturing products outside the tracked family universe.
  • What effective calculated-duty rate is observed for imports from Cayman Islands? In 2025, imports from Cayman Islands had an effective calculated-duty rate of 9.4% across tracked families. The rate is reported Calculated Duties divided by the customs value covered by those duty observations, which reflects the combined product, origin, preference and tariff mix in USITC's statistics. A year earlier the rate was 3.28%.
  • What does the U.S. import most from Cayman Islands? Among tracked manufacturing families, Cayman Islands's largest recent categories are batteries and storage cells, measuring and inspection instruments, filtering and separation equipment, switchgear, connectors, and controls. Each has its own live rate page linked below.
  • Is the tariff burden on Cayman Islands rising or falling? Rising: the effective rate on tracked imports from Cayman Islands moved +6.1 points year over year to 9.4% in 2025. Monthly family-level detail is on each linked family page.

About this data

  • Reference statistics derived from USITC published data. Not a customs ruling. MFN-Free and Special-rate fields describe statutory line coverage only; final entry liability requires origin, date, eligibility, exclusions and other transaction facts. Calculated Duties are statistical estimates, not a cash-collections ledger. Confirm classification, origin, program eligibility, and final entry liability with a licensed customs broker.

Last reviewed 2026-10-01.