Tariff Monitor
Tariffs on Imports From Gabon
In 2025, U.S. importers brought in $581K of goods from Gabon across 12 manufacturing families MFG Calcs tracks, carrying an effective calculated-duty rate of 1.59%, down from 1.83% the year before. Gabon's largest tracked categories: transformers and power supplies, nickel and nickel alloys, plastic semi-finished products. Tracked-family totals are a floor on total bilateral trade, from USITC DataWeb data.
The current reading
- Tracked imports from Gabon: $581K in 2025 across 12 manufacturing families, a floor on total bilateral trade.
- Observed effective calculated-duty rate: 1.59% (1.83% the year before), reported Calculated Duties ÷ covered customs value.
- History depth: 2 years of annual named-source boards.
Largest tracked families from Gabon
- Transformers and power supplies
- Nickel and nickel alloys
- Plastic semi-finished products
- Valves and fluid controls
- Gears and power transmission
Frequently asked questions
- How much does the U.S. import from Gabon? U.S. imports from Gabon totaled $581K in customs value in 2025, across the 12 manufacturing material and equipment families MFG Calcs tracks. That is a floor on total bilateral trade. It excludes manufacturing products outside the tracked family universe.
- What effective calculated-duty rate is observed for imports from Gabon? In 2025, imports from Gabon had an effective calculated-duty rate of 1.59% across tracked families. The rate is reported Calculated Duties divided by the customs value covered by those duty observations, which reflects the combined product, origin, preference and tariff mix in USITC's statistics. A year earlier the rate was 1.83%.
- What does the U.S. import most from Gabon? Among tracked manufacturing families, Gabon's largest recent categories are transformers and power supplies, nickel and nickel alloys, plastic semi-finished products, valves and fluid controls. Each has its own live rate page linked below.
- Is the tariff burden on Gabon rising or falling? Falling: the effective rate on tracked imports from Gabon moved -0.2 points year over year to 1.59% in 2025. Monthly family-level detail is on each linked family page.
About this data
- Reference statistics derived from USITC published data. Not a customs ruling. MFN-Free and Special-rate fields describe statutory line coverage only; final entry liability requires origin, date, eligibility, exclusions and other transaction facts. Calculated Duties are statistical estimates, not a cash-collections ledger. Confirm classification, origin, program eligibility, and final entry liability with a licensed customs broker.
Last reviewed 2026-10-01.