Tariff Monitor
Tariffs on Imports From Nauru
In 2025, U.S. importers brought in $52K of goods from Nauru across 3 manufacturing families MFG Calcs tracks, carrying an effective calculated-duty rate of 0.33%, down from 2.66% the year before. Nauru's largest tracked categories: cutting tools and inserts, rubber materials and products, iron and steel castings and articles. Tracked-family totals are a floor on total bilateral trade, from USITC DataWeb data.
The current reading
- Tracked imports from Nauru: $52K in 2025 across 3 manufacturing families, a floor on total bilateral trade.
- Observed effective calculated-duty rate: 0.33% (2.66% the year before), reported Calculated Duties ÷ covered customs value.
- History depth: 2 years of annual named-source boards.
Largest tracked families from Nauru
- Cutting tools and inserts
- Rubber materials and products
- Iron and steel castings and articles
- Valves and fluid controls
- Packaging and filling machinery
Frequently asked questions
- How much does the U.S. import from Nauru? U.S. imports from Nauru totaled $52K in customs value in 2025, across the 3 manufacturing material and equipment families MFG Calcs tracks. That is a floor on total bilateral trade. It excludes manufacturing products outside the tracked family universe.
- What effective calculated-duty rate is observed for imports from Nauru? In 2025, imports from Nauru had an effective calculated-duty rate of 0.33% across tracked families. The rate is reported Calculated Duties divided by the customs value covered by those duty observations, which reflects the combined product, origin, preference and tariff mix in USITC's statistics. A year earlier the rate was 2.66%.
- What does the U.S. import most from Nauru? Among tracked manufacturing families, Nauru's largest recent categories are cutting tools and inserts, rubber materials and products, iron and steel castings and articles, valves and fluid controls. Each has its own live rate page linked below.
- Is the tariff burden on Nauru rising or falling? Falling: the effective rate on tracked imports from Nauru moved -2.3 points year over year to 0.33% in 2025. Monthly family-level detail is on each linked family page.
About this data
- Reference statistics derived from USITC published data. Not a customs ruling. MFN-Free and Special-rate fields describe statutory line coverage only; final entry liability requires origin, date, eligibility, exclusions and other transaction facts. Calculated Duties are statistical estimates, not a cash-collections ledger. Confirm classification, origin, program eligibility, and final entry liability with a licensed customs broker.
Last reviewed 2026-10-01.