Tariff Monitor

Tariffs on Imports From Czechia (Czech Republic)

In 2025, U.S. importers brought in $2.7B of goods from Czechia (Czech Republic) across 57 manufacturing families MFG Calcs tracks, carrying an effective calculated-duty rate of 10.61%, up from 1.68% the year before. Czechia (Czech Republic)'s largest tracked categories: turbines and fluid-power drives, switchgear, connectors, and controls, pumps for liquids. Tracked-family totals are a floor on total bilateral trade, from USITC DataWeb data.

The current reading

  • Tracked imports from Czechia (Czech Republic): $2.7B in 2025 across 57 manufacturing families, a floor on total bilateral trade.
  • Observed effective calculated-duty rate: 10.61% (1.68% the year before), reported Calculated Duties ÷ covered customs value.
  • History depth: 10 years of annual named-source boards.

Largest tracked families from Czechia (Czech Republic)

  • Turbines and fluid-power drives
  • Switchgear, connectors, and controls
  • Pumps for liquids
  • Electric motors and generators
  • Valves and fluid controls

Frequently asked questions

  • How much does the U.S. import from Czechia (Czech Republic)? U.S. imports from Czechia (Czech Republic) totaled $2.7B in customs value in 2025, across the 57 manufacturing material and equipment families MFG Calcs tracks. That is a floor on total bilateral trade. It excludes manufacturing products outside the tracked family universe.
  • What effective calculated-duty rate is observed for imports from Czechia (Czech Republic)? In 2025, imports from Czechia (Czech Republic) had an effective calculated-duty rate of 10.61% across tracked families. The rate is reported Calculated Duties divided by the customs value covered by those duty observations, which reflects the combined product, origin, preference and tariff mix in USITC's statistics. A year earlier the rate was 1.68%.
  • What does the U.S. import most from Czechia (Czech Republic)? Among tracked manufacturing families, Czechia (Czech Republic)'s largest recent categories are turbines and fluid-power drives, switchgear, connectors, and controls, pumps for liquids, electric motors and generators. Each has its own live rate page linked below.
  • Is the tariff burden on Czechia (Czech Republic) rising or falling? Rising: the effective rate on tracked imports from Czechia (Czech Republic) moved +8.9 points year over year to 10.61% in 2025. Monthly family-level detail is on each linked family page.

About this data

  • Reference statistics derived from USITC published data. Not a customs ruling. MFN-Free and Special-rate fields describe statutory line coverage only; final entry liability requires origin, date, eligibility, exclusions and other transaction facts. Calculated Duties are statistical estimates, not a cash-collections ledger. Confirm classification, origin, program eligibility, and final entry liability with a licensed customs broker.

Last reviewed 2026-10-01.