Tariff Monitor
U.S. Imports of Foundry and rolling equipment From Czechia (Czech Republic)
In 2025, U.S. importers brought in $9.2M of foundry and rolling equipment from Czechia (Czech Republic); the reported effective calculated-duty rate was 8.82% for that flow. That makes Czechia (Czech Republic) the 22nd-largest named source of this family, at 0.6% of tracked foundry and rolling equipment imports. The family-wide effective calculated-duty rate is 9.04%, so Czechia (Czech Republic)'s observed rate is 0.2 points less than average. Freight and insurance add 2.75% on top of customs value. Tracked-family figures are a floor on total bilateral trade.
The current reading
- Import value: $9.2M of foundry and rolling equipment from Czechia (Czech Republic) in 2025, customs value.
- Observed effective calculated-duty rate: 8.82%, reported Calculated Duties ÷ covered customs value, 0.2 points below the 9.04% family average.
- Share of the family: 0.6%, #22 named source of foundry and rolling equipment.
- Reported freight and insurance: 2.75% of customs value, shown alongside the effective calculated-duty rate.
- History depth: 3 years of annual named-source boards.
Frequently asked questions
- What tariff does the U.S. charge on foundry and rolling equipment from Czechia (Czech Republic)? In 2025, the reported effective calculated-duty rate was 8.82% for foundry and rolling equipment imported from Czechia (Czech Republic), calculated as reported Calculated Duties divided by covered customs value. It reflects the observed entry mix but does not identify the legal cause of the rate or determine an entry-specific duty.
- How much foundry and rolling equipment does the U.S. import from Czechia (Czech Republic)? The U.S. imported $9.2M of foundry and rolling equipment from Czechia (Czech Republic) in 2025, 0.6% of the tracked foundry and rolling equipment it imports, ranking Czechia (Czech Republic) the 22nd-largest named source. The chart above traces the retained reported years; a year with no retained source row is unknown, not zero.
- What does freight add on foundry and rolling equipment from Czechia (Czech Republic)? Cost, insurance, and freight ran 2.75% of customs value on foundry and rolling equipment from Czechia (Czech Republic) in 2025. That is an additional import burden alongside the reported effective calculated-duty rate; a country-specific invoice price is still required for a comparable landed unit cost.
About this data
- Reference statistics derived from USITC published data. Not a customs ruling. MFN-Free and Special-rate fields describe statutory line coverage only; final entry liability requires origin, date, eligibility, exclusions and other transaction facts. Calculated Duties are statistical estimates, not a cash-collections ledger. Confirm classification, origin, program eligibility, and final entry liability with a licensed customs broker.
Last reviewed 2026-10-01.