Tariff Monitor
Tariffs on Imports From Mauritius
In 2025, U.S. importers brought in $514K of goods from Mauritius across 15 manufacturing families MFG Calcs tracks, carrying an effective calculated-duty rate of 9.77%, up from 2.27% the year before. Mauritius's largest tracked categories: molds and die sets, insulated wire and cable, semiconductors and integrated circuits. Tracked-family totals are a floor on total bilateral trade, from USITC DataWeb data.
The current reading
- Tracked imports from Mauritius: $514K in 2025 across 15 manufacturing families, a floor on total bilateral trade.
- Observed effective calculated-duty rate: 9.77% (2.27% the year before), reported Calculated Duties ÷ covered customs value.
- History depth: 2 years of annual named-source boards.
Largest tracked families from Mauritius
- Molds and die sets
- Insulated wire and cable
- Semiconductors and integrated circuits
- Electric motors and generators
- Measuring and inspection instruments
Frequently asked questions
- How much does the U.S. import from Mauritius? U.S. imports from Mauritius totaled $514K in customs value in 2025, across the 15 manufacturing material and equipment families MFG Calcs tracks. That is a floor on total bilateral trade. It excludes manufacturing products outside the tracked family universe.
- What effective calculated-duty rate is observed for imports from Mauritius? In 2025, imports from Mauritius had an effective calculated-duty rate of 9.77% across tracked families. The rate is reported Calculated Duties divided by the customs value covered by those duty observations, which reflects the combined product, origin, preference and tariff mix in USITC's statistics. A year earlier the rate was 2.27%.
- What does the U.S. import most from Mauritius? Among tracked manufacturing families, Mauritius's largest recent categories are molds and die sets, insulated wire and cable, semiconductors and integrated circuits, electric motors and generators. Each has its own live rate page linked below.
- Is the tariff burden on Mauritius rising or falling? Rising: the effective rate on tracked imports from Mauritius moved +7.5 points year over year to 9.77% in 2025. Monthly family-level detail is on each linked family page.
About this data
- Reference statistics derived from USITC published data. Not a customs ruling. MFN-Free and Special-rate fields describe statutory line coverage only; final entry liability requires origin, date, eligibility, exclusions and other transaction facts. Calculated Duties are statistical estimates, not a cash-collections ledger. Confirm classification, origin, program eligibility, and final entry liability with a licensed customs broker.
Last reviewed 2026-10-01.