Tariff Monitor
Tariffs on Imports From San Marino
In 2025, U.S. importers brought in $15.1M of goods from San Marino across 20 manufacturing families MFG Calcs tracks, carrying an effective calculated-duty rate of 8.31%, up from 2.28% the year before. San Marino's largest tracked categories: packaging and filling machinery, metal-cutting machine tools, aluminum semi-finished products. Tracked-family totals are a floor on total bilateral trade, from USITC DataWeb data.
The current reading
- Tracked imports from San Marino: $15.1M in 2025 across 20 manufacturing families, a floor on total bilateral trade.
- Observed effective calculated-duty rate: 8.31% (2.28% the year before), reported Calculated Duties ÷ covered customs value.
- History depth: 2 years of annual named-source boards.
Largest tracked families from San Marino
- Packaging and filling machinery
- Metal-cutting machine tools
- Aluminum semi-finished products
- Industrial furnaces and ovens
- Switchgear, connectors, and controls
Frequently asked questions
- How much does the U.S. import from San Marino? U.S. imports from San Marino totaled $15.1M in customs value in 2025, across the 20 manufacturing material and equipment families MFG Calcs tracks. That is a floor on total bilateral trade. It excludes manufacturing products outside the tracked family universe.
- What effective calculated-duty rate is observed for imports from San Marino? In 2025, imports from San Marino had an effective calculated-duty rate of 8.31% across tracked families. The rate is reported Calculated Duties divided by the customs value covered by those duty observations, which reflects the combined product, origin, preference and tariff mix in USITC's statistics. A year earlier the rate was 2.28%.
- What does the U.S. import most from San Marino? Among tracked manufacturing families, San Marino's largest recent categories are packaging and filling machinery, metal-cutting machine tools, aluminum semi-finished products, industrial furnaces and ovens. Each has its own live rate page linked below.
- Is the tariff burden on San Marino rising or falling? Rising: the effective rate on tracked imports from San Marino moved +6 points year over year to 8.31% in 2025. Monthly family-level detail is on each linked family page.
About this data
- Reference statistics derived from USITC published data. Not a customs ruling. MFN-Free and Special-rate fields describe statutory line coverage only; final entry liability requires origin, date, eligibility, exclusions and other transaction facts. Calculated Duties are statistical estimates, not a cash-collections ledger. Confirm classification, origin, program eligibility, and final entry liability with a licensed customs broker.
Last reviewed 2026-10-01.