Tariff Monitor
Tariffs on Imports From Tanzania
In 2025, U.S. importers brought in $14.7M of goods from Tanzania across 13 manufacturing families MFG Calcs tracks, carrying an effective calculated-duty rate of 1.34%, down from 4.12% the year before. Tanzania's largest tracked categories: semiconductors and integrated circuits, plastics in primary forms, compressors and fans. Tracked-family totals are a floor on total bilateral trade, from USITC DataWeb data.
The current reading
- Tracked imports from Tanzania: $14.7M in 2025 across 13 manufacturing families, a floor on total bilateral trade.
- Observed effective calculated-duty rate: 1.34% (4.12% the year before), reported Calculated Duties ÷ covered customs value.
- History depth: 2 years of annual named-source boards.
Largest tracked families from Tanzania
- Semiconductors and integrated circuits
- Plastics in primary forms
- Compressors and fans
- Electric motors and generators
- Turbines and fluid-power drives
Frequently asked questions
- How much does the U.S. import from Tanzania? U.S. imports from Tanzania totaled $14.7M in customs value in 2025, across the 13 manufacturing material and equipment families MFG Calcs tracks. That is a floor on total bilateral trade. It excludes manufacturing products outside the tracked family universe.
- What effective calculated-duty rate is observed for imports from Tanzania? In 2025, imports from Tanzania had an effective calculated-duty rate of 1.34% across tracked families. The rate is reported Calculated Duties divided by the customs value covered by those duty observations, which reflects the combined product, origin, preference and tariff mix in USITC's statistics. A year earlier the rate was 4.12%.
- What does the U.S. import most from Tanzania? Among tracked manufacturing families, Tanzania's largest recent categories are semiconductors and integrated circuits, plastics in primary forms, compressors and fans, electric motors and generators. Each has its own live rate page linked below.
- Is the tariff burden on Tanzania rising or falling? Falling: the effective rate on tracked imports from Tanzania moved -2.8 points year over year to 1.34% in 2025. Monthly family-level detail is on each linked family page.
About this data
- Reference statistics derived from USITC published data. Not a customs ruling. MFN-Free and Special-rate fields describe statutory line coverage only; final entry liability requires origin, date, eligibility, exclusions and other transaction facts. Calculated Duties are statistical estimates, not a cash-collections ledger. Confirm classification, origin, program eligibility, and final entry liability with a licensed customs broker.
Last reviewed 2026-10-01.