Tariff Monitor
Tariffs on Imports From Wallis and Futuna
In 2025, U.S. importers brought in $1K of goods from Wallis and Futuna across 1 manufacturing families MFG Calcs tracks, carrying an effective calculated-duty rate of 2.48%, down from 2.9% the year before. Wallis and Futuna's largest tracked categories: cutting tools and inserts, rubber materials and products. Tracked-family totals are a floor on total bilateral trade, from USITC DataWeb data.
The current reading
- Tracked imports from Wallis and Futuna: $1K in 2025 across 1 manufacturing families, a floor on total bilateral trade.
- Observed effective calculated-duty rate: 2.48% (2.9% the year before), reported Calculated Duties ÷ covered customs value.
- History depth: 2 years of annual named-source boards.
Largest tracked families from Wallis and Futuna
- Cutting tools and inserts
- Rubber materials and products
Frequently asked questions
- How much does the U.S. import from Wallis and Futuna? U.S. imports from Wallis and Futuna totaled $1K in customs value in 2025, across the 1 manufacturing material and equipment families MFG Calcs tracks. That is a floor on total bilateral trade. It excludes manufacturing products outside the tracked family universe.
- What effective calculated-duty rate is observed for imports from Wallis and Futuna? In 2025, imports from Wallis and Futuna had an effective calculated-duty rate of 2.48% across tracked families. The rate is reported Calculated Duties divided by the customs value covered by those duty observations, which reflects the combined product, origin, preference and tariff mix in USITC's statistics. A year earlier the rate was 2.9%.
- What does the U.S. import most from Wallis and Futuna? Among tracked manufacturing families, Wallis and Futuna's largest recent categories are cutting tools and inserts, rubber materials and products. Each has its own live rate page linked below.
- Is the tariff burden on Wallis and Futuna rising or falling? Falling: the effective rate on tracked imports from Wallis and Futuna moved -0.4 points year over year to 2.48% in 2025. Monthly family-level detail is on each linked family page.
About this data
- Reference statistics derived from USITC published data. Not a customs ruling. MFN-Free and Special-rate fields describe statutory line coverage only; final entry liability requires origin, date, eligibility, exclusions and other transaction facts. Calculated Duties are statistical estimates, not a cash-collections ledger. Confirm classification, origin, program eligibility, and final entry liability with a licensed customs broker.
Last reviewed 2026-10-01.