Tariff Monitor
Tariffs on Imports From New Caledonia
In 2025, U.S. importers brought in $4K of goods from New Caledonia across 1 manufacturing families MFG Calcs tracks, carrying an effective calculated-duty rate of 2.49%, up from 1.83% the year before. New Caledonia's largest tracked categories: pumps for liquids, internal combustion engines, semiconductor and display equipment. Tracked-family totals are a floor on total bilateral trade, from USITC DataWeb data.
The current reading
- Tracked imports from New Caledonia: $4K in 2025 across 1 manufacturing families, a floor on total bilateral trade.
- Observed effective calculated-duty rate: 2.49% (1.83% the year before), reported Calculated Duties ÷ covered customs value.
- History depth: 2 years of annual named-source boards.
Largest tracked families from New Caledonia
- Pumps for liquids
- Internal combustion engines
- Semiconductor and display equipment
- Switchgear, connectors, and controls
- Rubber materials and products
Frequently asked questions
- How much does the U.S. import from New Caledonia? U.S. imports from New Caledonia totaled $4K in customs value in 2025, across the 1 manufacturing material and equipment families MFG Calcs tracks. That is a floor on total bilateral trade. It excludes manufacturing products outside the tracked family universe.
- What effective calculated-duty rate is observed for imports from New Caledonia? In 2025, imports from New Caledonia had an effective calculated-duty rate of 2.49% across tracked families. The rate is reported Calculated Duties divided by the customs value covered by those duty observations, which reflects the combined product, origin, preference and tariff mix in USITC's statistics. A year earlier the rate was 1.83%.
- What does the U.S. import most from New Caledonia? Among tracked manufacturing families, New Caledonia's largest recent categories are pumps for liquids, internal combustion engines, semiconductor and display equipment, switchgear, connectors, and controls. Each has its own live rate page linked below.
- Is the tariff burden on New Caledonia rising or falling? Rising: the effective rate on tracked imports from New Caledonia moved +0.7 points year over year to 2.49% in 2025. Monthly family-level detail is on each linked family page.
About this data
- Reference statistics derived from USITC published data. Not a customs ruling. MFN-Free and Special-rate fields describe statutory line coverage only; final entry liability requires origin, date, eligibility, exclusions and other transaction facts. Calculated Duties are statistical estimates, not a cash-collections ledger. Confirm classification, origin, program eligibility, and final entry liability with a licensed customs broker.
Last reviewed 2026-10-01.