Industrial Filtration, Separation & Dust Collection calculator

Measured Emissions Capture Rate Calculator

Check how much generated contaminant reaches the control system. Enter a matched process mass balance and the source-capture target for that test.

What this calculator does

  • Check how much generated contaminant reaches the control system.

Formula used

  • Source capture % = Mass entering control system × 100 ÷ Mass generated
  • Uncaptured mass = Generated mass − Captured mass
  • Target shortfall = Required capture − Measured capture

Inputs explained

  • Contaminant Captured at Source: Mass entering the control system from the defined process.
  • Contaminant Generated by Process: Matched total generated mass before hood capture.
  • Required Source Capture: Capture target specified for this process and test.

How to use the result

  • Best suited to hood capture test reviews, source mass balances.
  • The result is not an emissions compliance or exposure determination.

Common questions

  • Is capture the same as collection efficiency? No. Capture reaches the control device; collection removes contaminant from the stream inside that device.
  • Can I use dust-bin weight as captured mass? Not directly. It excludes material that entered the collector but escaped or remained in its inventory.
  • Why require captured mass below generated mass? A larger value indicates inconsistent boundaries, stored-material release or measurement error.
  • Does high capture establish worker exposure? No. Exposure requires an appropriate occupational sampling assessment.

Last reviewed 2026-10-12.