Industrial Filtration, Separation & Dust Collection calculator

Measured Cyclone Collection Efficiency Calculator

Measure a cyclone’s overall dry-solids collection efficiency. Enter captured and inlet mass from the same test and your specified efficiency target.

What this calculator does

  • Measure a cyclone’s overall dry-solids collection efficiency.

Formula used

  • Collection efficiency % = Captured dry solids × 100 ÷ Inlet dry solids
  • Uncaptured solids = Inlet solids − Captured solids
  • Target shortfall = Required efficiency − Measured efficiency

Inputs explained

  • Captured Dry Solids: Recovered dry solids over the complete test window.
  • Inlet Dry Solids: Measured incoming dry solids in the same test.
  • Required Collection Efficiency: Performance target specified for the tested solids mixture.

How to use the result

  • Best suited to cyclone acceptance tests, matched solids balances.
  • Overall mass efficiency does not establish fine-particle or exposure compliance.

Common questions

  • Can captured mass exceed inlet mass? No. Check moisture, inventory release and the test window if the balance produces that result.
  • Does 90% overall efficiency mean 90% for every particle size? No. Cyclones collect different particle sizes with different efficiencies.
  • Can I compare wet and dry weights? No. Correct both measurements to a consistent dry-solids basis first.
  • What does a negative shortfall mean? Measured overall collection exceeds the target you entered.

Last reviewed 2026-10-12.