Manufacturing Economy Monitor
Manufacturing in Montana
Manufacturing contributed $4.1B to Montana's economy in 2025 (5% of the state's GDP), ranking Montana #46 of 50 states and DC by manufacturing output, per the Bureau of Economic Analysis. Output fell 8.9% year over year (-7.9% after inflation). The state's largest manufacturing industry is petroleum and coal products ($1.8B in 2025).
Output and rank
- Manufacturing GDP: $4.1B in 2025, #46 of 50 states and DC.
- Share of the state economy: 5% of Montana's GDP.
- Growth: -8.9% year over year (-7.9% after inflation).
- Composition: $1.6B durable goods, $2.4B nondurable goods.
Largest manufacturing industries in Montana
- Petroleum and Coal Products: $1.8B (2025)
- Food, Beverage, and Tobacco Products: $342M (2025)
- Fabricated Metal Products: $337M (2025)
Frequently asked questions
- How big is manufacturing in Montana? Manufacturing contributed $4.1B to Montana's economy in 2025, ranking #46 of 50 states and DC, per BEA state GDP data.
- What share of Montana's economy is manufacturing? Manufacturing is 5% of Montana's GDP in 2025. Nationally, manufacturing averages 9.5% of GDP, so Montana is less manufacturing-intensive than the national average.
- What is the largest manufacturing industry in Montana? Petroleum and Coal Products leads at $1.8B (2025), followed by food, beverage, and tobacco products ($342M) and fabricated metal products ($337M), per BEA state GDP by industry.
- Is manufacturing in Montana growing? Montana's manufacturing GDP is down 8.9% year over year in dollar terms and down 7.9% after inflation, per the latest BEA annual data (2025).
- Does Montana make more durable or nondurable goods? Nondurable goods lead in Montana: $2.4B versus $1.6B of value added in 2025.
About this data
- Source: U.S. Bureau of Economic Analysis (public domain). National quarterly values are seasonally adjusted annual rates. Corporate-profit industry detail reflects inventory valuation adjustment without capital consumption adjustment, per NIPA table 6.16D conventions.
Last reviewed 2026-10-01.