MFG Calcs Signals
Where Is It Cheapest to Manufacture?
The State Cost-to-Manufacture Index: each U.S. state against a national average of 100, blending its manufacturing wage index and industrial electricity price.
What this Signal shows
- Rank U.S. states by what it costs to manufacture there, blending manufacturing wages and industrial electricity.
Cadence, source and downloads
- Cadence: Refreshed automatically whenever the wage and electricity data update.
- An illustrative composite of two live cost factors (BLS wages, EIA industrial electricity), not a full site-selection model (excludes taxes, land, incentives). Full board at /signals/state-cost-index.
- Free to download as All states (CSV), Full board (JSON), Methodology (JSON) under CC BY 4.0.
Last reviewed 2026-10-01.