Tariff Monitor
Tariffs on Imports From Fiji
In 2025, U.S. importers brought in $43K of goods from Fiji across 6 manufacturing families MFG Calcs tracks, carrying an effective calculated-duty rate of 10.5%, up from 0.62% the year before. Fiji's largest tracked categories: semiconductors and integrated circuits, pumps for liquids, switchgear, connectors, and controls. Tracked-family totals are a floor on total bilateral trade, from USITC DataWeb data.
The current reading
- Tracked imports from Fiji: $43K in 2025 across 6 manufacturing families, a floor on total bilateral trade.
- Observed effective calculated-duty rate: 10.5% (0.62% the year before), reported Calculated Duties ÷ covered customs value.
- History depth: 2 years of annual named-source boards.
Largest tracked families from Fiji
- Semiconductors and integrated circuits
- Pumps for liquids
- Switchgear, connectors, and controls
- Compressors and fans
- Molds and die sets
Frequently asked questions
- How much does the U.S. import from Fiji? U.S. imports from Fiji totaled $43K in customs value in 2025, across the 6 manufacturing material and equipment families MFG Calcs tracks. That is a floor on total bilateral trade. It excludes manufacturing products outside the tracked family universe.
- What effective calculated-duty rate is observed for imports from Fiji? In 2025, imports from Fiji had an effective calculated-duty rate of 10.5% across tracked families. The rate is reported Calculated Duties divided by the customs value covered by those duty observations, which reflects the combined product, origin, preference and tariff mix in USITC's statistics. A year earlier the rate was 0.62%.
- What does the U.S. import most from Fiji? Among tracked manufacturing families, Fiji's largest recent categories are semiconductors and integrated circuits, pumps for liquids, switchgear, connectors, and controls, compressors and fans. Each has its own live rate page linked below.
- Is the tariff burden on Fiji rising or falling? Rising: the effective rate on tracked imports from Fiji moved +9.9 points year over year to 10.5% in 2025. Monthly family-level detail is on each linked family page.
About this data
- Reference statistics derived from USITC published data. Not a customs ruling. MFN-Free and Special-rate fields describe statutory line coverage only; final entry liability requires origin, date, eligibility, exclusions and other transaction facts. Calculated Duties are statistical estimates, not a cash-collections ledger. Confirm classification, origin, program eligibility, and final entry liability with a licensed customs broker.
Last reviewed 2026-10-01.