Tariff Monitor

Tariffs on Imports From Oman

In 2025, U.S. importers brought in $648.3M of goods from Oman across 28 manufacturing families MFG Calcs tracks, carrying an effective calculated-duty rate of 17.94%, up from 4.22% the year before. Oman's largest tracked categories: plastic semi-finished products, aluminum semi-finished products, plastics in primary forms. Tracked-family totals are a floor on total bilateral trade, from USITC DataWeb data.

The current reading

  • Tracked imports from Oman: $648.3M in 2025 across 28 manufacturing families, a floor on total bilateral trade.
  • Observed effective calculated-duty rate: 17.94% (4.22% the year before), reported Calculated Duties ÷ covered customs value.
  • History depth: 12 years of annual named-source boards.

Largest tracked families from Oman

  • Plastic semi-finished products
  • Aluminum semi-finished products
  • Plastics in primary forms
  • Steel pipe and tube
  • Steel bar, rod, and wire

Frequently asked questions

  • How much does the U.S. import from Oman? U.S. imports from Oman totaled $648.3M in customs value in 2025, across the 28 manufacturing material and equipment families MFG Calcs tracks. That is a floor on total bilateral trade. It excludes manufacturing products outside the tracked family universe.
  • What effective calculated-duty rate is observed for imports from Oman? In 2025, imports from Oman had an effective calculated-duty rate of 17.94% across tracked families. The rate is reported Calculated Duties divided by the customs value covered by those duty observations, which reflects the combined product, origin, preference and tariff mix in USITC's statistics. A year earlier the rate was 4.22%.
  • What does the U.S. import most from Oman? Among tracked manufacturing families, Oman's largest recent categories are plastic semi-finished products, aluminum semi-finished products, plastics in primary forms, steel pipe and tube. Each has its own live rate page linked below.
  • Is the tariff burden on Oman rising or falling? Rising: the effective rate on tracked imports from Oman moved +13.7 points year over year to 17.94% in 2025. Monthly family-level detail is on each linked family page.

About this data

  • Reference statistics derived from USITC published data. Not a customs ruling. MFN-Free and Special-rate fields describe statutory line coverage only; final entry liability requires origin, date, eligibility, exclusions and other transaction facts. Calculated Duties are statistical estimates, not a cash-collections ledger. Confirm classification, origin, program eligibility, and final entry liability with a licensed customs broker.

Last reviewed 2026-10-01.