Tariff Monitor
Tariffs on Imports From Peru
In 2025, U.S. importers brought in $555.1M of goods from Peru across 45 manufacturing families MFG Calcs tracks, carrying an effective calculated-duty rate of 11.48%, up from 0.15% the year before. Peru's largest tracked categories: copper semi-finished products, plastic semi-finished products, plastics in primary forms. Tracked-family totals are a floor on total bilateral trade, from USITC DataWeb data.
The current reading
- Tracked imports from Peru: $555.1M in 2025 across 45 manufacturing families, a floor on total bilateral trade.
- Observed effective calculated-duty rate: 11.48% (0.15% the year before), reported Calculated Duties ÷ covered customs value.
- History depth: 12 years of annual named-source boards.
Largest tracked families from Peru
- Copper semi-finished products
- Plastic semi-finished products
- Plastics in primary forms
- Batteries and storage cells
- Switchgear, connectors, and controls
Frequently asked questions
- How much does the U.S. import from Peru? U.S. imports from Peru totaled $555.1M in customs value in 2025, across the 45 manufacturing material and equipment families MFG Calcs tracks. That is a floor on total bilateral trade. It excludes manufacturing products outside the tracked family universe.
- What effective calculated-duty rate is observed for imports from Peru? In 2025, imports from Peru had an effective calculated-duty rate of 11.48% across tracked families. The rate is reported Calculated Duties divided by the customs value covered by those duty observations, which reflects the combined product, origin, preference and tariff mix in USITC's statistics. A year earlier the rate was 0.15%.
- What does the U.S. import most from Peru? Among tracked manufacturing families, Peru's largest recent categories are copper semi-finished products, plastic semi-finished products, plastics in primary forms, batteries and storage cells. Each has its own live rate page linked below.
- Is the tariff burden on Peru rising or falling? Rising: the effective rate on tracked imports from Peru moved +11.3 points year over year to 11.48% in 2025. Monthly family-level detail is on each linked family page.
About this data
- Reference statistics derived from USITC published data. Not a customs ruling. MFN-Free and Special-rate fields describe statutory line coverage only; final entry liability requires origin, date, eligibility, exclusions and other transaction facts. Calculated Duties are statistical estimates, not a cash-collections ledger. Confirm classification, origin, program eligibility, and final entry liability with a licensed customs broker.
Last reviewed 2026-10-01.