Tariff Monitor

Tariffs on Imports From Sri Lanka

In 2025, U.S. importers brought in $109.7M of goods from Sri Lanka across 44 manufacturing families MFG Calcs tracks, carrying an effective calculated-duty rate of 12.91%, up from 0.83% the year before. Sri Lanka's largest tracked categories: rubber materials and products, switchgear, connectors, and controls, measuring and inspection instruments. Tracked-family totals are a floor on total bilateral trade, from USITC DataWeb data.

The current reading

  • Tracked imports from Sri Lanka: $109.7M in 2025 across 44 manufacturing families, a floor on total bilateral trade.
  • Observed effective calculated-duty rate: 12.91% (0.83% the year before), reported Calculated Duties ÷ covered customs value.
  • History depth: 2 years of annual named-source boards.

Largest tracked families from Sri Lanka

  • Rubber materials and products
  • Switchgear, connectors, and controls
  • Measuring and inspection instruments
  • Steel fasteners
  • Insulated wire and cable

Frequently asked questions

  • How much does the U.S. import from Sri Lanka? U.S. imports from Sri Lanka totaled $109.7M in customs value in 2025, across the 44 manufacturing material and equipment families MFG Calcs tracks. That is a floor on total bilateral trade. It excludes manufacturing products outside the tracked family universe.
  • What effective calculated-duty rate is observed for imports from Sri Lanka? In 2025, imports from Sri Lanka had an effective calculated-duty rate of 12.91% across tracked families. The rate is reported Calculated Duties divided by the customs value covered by those duty observations, which reflects the combined product, origin, preference and tariff mix in USITC's statistics. A year earlier the rate was 0.83%.
  • What does the U.S. import most from Sri Lanka? Among tracked manufacturing families, Sri Lanka's largest recent categories are rubber materials and products, switchgear, connectors, and controls, measuring and inspection instruments, steel fasteners. Each has its own live rate page linked below.
  • Is the tariff burden on Sri Lanka rising or falling? Rising: the effective rate on tracked imports from Sri Lanka moved +12.1 points year over year to 12.91% in 2025. Monthly family-level detail is on each linked family page.

About this data

  • Reference statistics derived from USITC published data. Not a customs ruling. MFN-Free and Special-rate fields describe statutory line coverage only; final entry liability requires origin, date, eligibility, exclusions and other transaction facts. Calculated Duties are statistical estimates, not a cash-collections ledger. Confirm classification, origin, program eligibility, and final entry liability with a licensed customs broker.

Last reviewed 2026-10-01.