Weighing, Dosing & Loss-in-Weight Feeding calculator

Bulk Density Feed Adjustment Calculator

Adjust volumetric delivery to retain a reference mass-flow target after a density change. Enter reference volume rate and the two measured bulk densities.

What this calculator does

  • Adjust volumetric delivery to retain a reference mass-flow target after a density change.

Formula used

  • Target mass flow = Reference volume rate × Reference density
  • Adjusted volume rate = Target mass flow ÷ Current density
  • Uncorrected mass flow = Reference volume rate × Current density

Inputs explained

  • Reference Volumetric Rate: Qualified volume rate at the reference material condition.
  • Reference Bulk Density: Measured density corresponding to the reference volume rate.
  • Current Bulk Density: Density representative of the current metering condition.

How to use the result

  • Best suited to raw material lot changes, volumetric feed adjustments.
  • Volume requirement does not directly specify motor speed or controller calibration.

Common questions

  • Why does lower density require higher volume? Each liter contains less mass, so more liters are needed for the same mass flow.
  • Can I use solid material density? Use bulk density including voids between particles, representative of the feeder condition.
  • What happens at zero reference flow? The reference mass flow, adjusted volume rate and uncorrected mass flow are all zero. A density change alone does not create material flow.
  • Will a gravimetric feeder need this manual correction? Its control loop generally adjusts based on mass loss, but qualified operation and refill behavior still need verification.

Last reviewed 2026-10-12.