Weighing, Dosing & Loss-in-Weight Feeding calculator

Dosing Quality Loss Cost Calculator

Cost a documented dosing-quality scrap event. Enter rejected product mass, accumulated manufacturing cost, verified salvage credit and additional disposition expenses.

What this calculator does

  • Cost a documented dosing-quality scrap event.

Formula used

  • Gross scrap cost = Scrapped product kg × Accumulated cost per kg
  • Net scrap cost = Gross scrap cost − Salvage credit
  • Quality loss = Net scrap cost + Investigation and disposition

Inputs explained

  • Dosed Product Scrapped: Net finished or intermediate product rejected for dosing quality.
  • Accumulated Product Cost: Manufacturing cost already incurred per scrapped kilogram.
  • Verified Total Salvage Credit: Realizable recovery value after any unentered recovery charges.
  • Investigation and Disposition Cost: Additional event expense excluded from accumulated product cost.

How to use the result

  • Best suited to dosing scrap disposition, quality cost reviews.
  • Lost future sales, recalls and customer penalties are outside this event scope.

Common questions

  • Should ingredient overfeed be added again? No, when it is already included in the scrapped product cost. Avoid counting the same material twice.
  • Can reworked product be treated as fully scrapped? Use only the actual unrecoverable cost and incremental rework expense for a rework case.
  • Why can net scrap cost be negative? The entered salvage exceeds accumulated scrap cost; review the credit and cost basis before reporting it.
  • Is product selling price the correct unit cost? Use incurred manufacturing cost here. Lost contribution from unrecovered sales is a separate economic effect.

Last reviewed 2026-10-12.