Weighing, Dosing & Loss-in-Weight Feeding calculator

Signed Dosing Error Calculator

Compare a weighed dose with its recipe target. Enter the delivered mass, target mass and allowed absolute percentage error.

What this calculator does

  • Compare a weighed dose with its recipe target.

Formula used

  • Dose error = Delivered mass − Target mass
  • Signed error % = Dose error × 100 ÷ Target mass
  • Error margin = Allowed error % − Abs(Signed error %)

Inputs explained

  • Delivered Net Dose: Tared dose mass measured with the reference balance.
  • Target Dose: Specified mass for this individual dose.
  • Maximum Absolute Dose Error: Symmetric percentage tolerance from the approved recipe.

How to use the result

  • Best suited to single dose verification, recipe tolerance checks.
  • Does not estimate repeatability, balance uncertainty or regulatory compliance.

Common questions

  • Why is the error signed? The sign distinguishes overfeed from underfeed, which can require different corrections.
  • What is the percentage denominator? The recipe target is the denominator, so a one-gram error on a hundred-gram target equals one percent.
  • Is the display resolution the measurement uncertainty? No. Calibration, repeatability and environmental effects also contribute to uncertainty.
  • Can several doses be averaged? An average can describe bias, but individual failures and repeatability need the individual dose results.

Last reviewed 2026-10-12.