Weighing, Dosing & Loss-in-Weight Feeding calculator

Two-Ingredient Recipe Cost Calculator

Cost a recipe containing one additive and one base ingredient. Enter final mass, additive mass share, both purchase prices and separate processing cost.

What this calculator does

  • Cost a recipe containing one additive and one base ingredient.

Formula used

  • Ingredient A mass = Batch mass × A share % ÷ 100
  • Ingredient B mass = Batch mass − Ingredient A mass
  • Batch cost = A mass × A price + B mass × B price + Processing
  • Cost per kg = Batch cost ÷ Batch mass

Inputs explained

  • Final Recipe Mass: Combined net mass of the two recipe ingredients.
  • Ingredient a Mass Share: Ingredient A percentage of final recipe mass.
  • Ingredient a Price: Landed purchase price for ingredient A.
  • Ingredient B Price: Landed purchase price for the remaining base ingredient.
  • Additional Batch Processing Cost: Batch cost excluded from ingredient purchase prices.

How to use the result

  • Best suited to additive cost comparisons, base resin recipe budgets.
  • Scrap, moisture change and ingredient potency are excluded.

Common questions

  • Can ingredient A be zero percent? Yes. The batch then consists entirely of ingredient B.
  • Where do three or more ingredients go? Use a full ingredient costing worksheet; this model deliberately represents only two ingredients.
  • Can processing cost include ingredient freight? Only if it is excluded from the ingredient prices; count each charge once.
  • Does this account for moisture loss? No. Both ingredient quantities and final batch mass use a common unchanged mass basis.

Last reviewed 2026-10-12.