Tariff Monitor
Tariffs on Imports From Lithuania
In 2025, U.S. importers brought in $132.7M of goods from Lithuania across 47 manufacturing families MFG Calcs tracks, carrying an effective calculated-duty rate of 10.38%, up from 1.68% the year before. Lithuania's largest tracked categories: switchgear, connectors, and controls, plastic semi-finished products, transformers and power supplies. Tracked-family totals are a floor on total bilateral trade, from USITC DataWeb data.
The current reading
- Tracked imports from Lithuania: $132.7M in 2025 across 47 manufacturing families, a floor on total bilateral trade.
- Observed effective calculated-duty rate: 10.38% (1.68% the year before), reported Calculated Duties ÷ covered customs value.
- History depth: 2 years of annual named-source boards.
Largest tracked families from Lithuania
- Switchgear, connectors, and controls
- Plastic semi-finished products
- Transformers and power supplies
- Fabricated structural steel
- Measuring and inspection instruments
Frequently asked questions
- How much does the U.S. import from Lithuania? U.S. imports from Lithuania totaled $132.7M in customs value in 2025, across the 47 manufacturing material and equipment families MFG Calcs tracks. That is a floor on total bilateral trade. It excludes manufacturing products outside the tracked family universe.
- What effective calculated-duty rate is observed for imports from Lithuania? In 2025, imports from Lithuania had an effective calculated-duty rate of 10.38% across tracked families. The rate is reported Calculated Duties divided by the customs value covered by those duty observations, which reflects the combined product, origin, preference and tariff mix in USITC's statistics. A year earlier the rate was 1.68%.
- What does the U.S. import most from Lithuania? Among tracked manufacturing families, Lithuania's largest recent categories are switchgear, connectors, and controls, plastic semi-finished products, transformers and power supplies, fabricated structural steel. Each has its own live rate page linked below.
- Is the tariff burden on Lithuania rising or falling? Rising: the effective rate on tracked imports from Lithuania moved +8.7 points year over year to 10.38% in 2025. Monthly family-level detail is on each linked family page.
About this data
- Reference statistics derived from USITC published data. Not a customs ruling. MFN-Free and Special-rate fields describe statutory line coverage only; final entry liability requires origin, date, eligibility, exclusions and other transaction facts. Calculated Duties are statistical estimates, not a cash-collections ledger. Confirm classification, origin, program eligibility, and final entry liability with a licensed customs broker.
Last reviewed 2026-10-01.