Weighing, Dosing & Loss-in-Weight Feeding calculator

Batch Weight Tolerance Window Calculator

Check a batch weight against a symmetric recipe tolerance. Enter the measured net weight, nominal target and allowed deviation in kilograms.

What this calculator does

  • Check a batch weight against a symmetric recipe tolerance.

Formula used

  • Lower limit = Target − Allowed deviation
  • Upper limit = Target + Allowed deviation
  • Nearest margin = Allowed deviation − Abs(Measured weight − Target)

Inputs explained

  • Measured Net Batch Weight: Tared batch weight from the calibrated scale.
  • Nominal Batch Target: Recipe target for this batch.
  • Allowed Deviation Each Side: Symmetric absolute mass tolerance from the batch specification.

How to use the result

  • Best suited to batch weight release, recipe cutoff reviews.
  • Asymmetric specifications require separate upper and lower checks.

Common questions

  • Is tolerance a percentage? No. Enter kilograms allowed on each side of the target.
  • Can the lower limit be negative? No. The allowed deviation cannot exceed the positive target mass.
  • What does zero margin mean? The measured batch is exactly on one entered numerical limit.
  • Does being inside the band authorize release? Use your release procedure, including measurement uncertainty and any other batch quality requirements.

Last reviewed 2026-10-12.