Weighing, Dosing & Loss-in-Weight Feeding calculator

Feeder Running Time Utilization Calculator

Measure how much scheduled time a feeder actually spends feeding. Enter logged feeding minutes, the matching production window and your minimum utilization target.

What this calculator does

  • Measure how much scheduled time a feeder actually spends feeding.

Formula used

  • Running utilization % = Feeding minutes × 100 ÷ Scheduled minutes
  • Nonfeeding time = Scheduled minutes − Feeding minutes
  • Target margin = Running utilization % − Required share %

Inputs explained

  • Recorded Feeding Time: Minutes actually feeding within the observed production window.
  • Scheduled Feeding Window: Scheduled minutes for this feeder, including recorded stops.
  • Required Running Time Share: Planned minimum feeding share for the same window.

How to use the result

  • Best suited to feeder stop reviews, scheduled time reconciliation.
  • Running at a low rate still counts as feeding time.

Common questions

  • Does refill count as running time? Count it when material continues feeding; classify actual feed interruptions as nonfeeding time.
  • Can scheduled breaks be removed? Yes, if your agreed denominator excludes them consistently across every comparison.
  • Is this capacity utilization? No. It measures time, not mass flow relative to the feeder rating.
  • Can several feeders be combined? Use summed feeder-minutes in both numerator and denominator, with the same scheduling rule.

Last reviewed 2026-10-12.