Weighing, Dosing & Loss-in-Weight Feeding calculator

Gravimetric Versus Volumetric Feed Delta Calculator

Compare a fixed volumetric setting with a required mass-flow setpoint. Enter volumetric delivery, current bulk density and the gravimetric target.

What this calculator does

  • Compare a fixed volumetric setting with a required mass-flow setpoint.

Formula used

  • Fixed-volume mass flow = Volumetric rate × Current bulk density
  • Mass-flow delta = Fixed-volume mass flow − Gravimetric setpoint
  • Required volume = Mass setpoint ÷ Current bulk density

Inputs explained

  • Fixed Volumetric Feed Rate: Measured volume delivered per hour at the fixed setting.
  • Current Bulk Density: Loose bulk density representative of material at the feeder.
  • Gravimetric Mass Setpoint: Required ingredient mass rate for the same process.

How to use the result

  • Best suited to density change comparisons, feeding method reviews.
  • Does not simulate screw fill, material compaction or control dynamics.

Common questions

  • Does gravimetric feeding ignore bulk density? It measures mass and can adjust the feed device, but refill and mechanical limits still affect performance.
  • Is loose bulk density always the correct value? Use a density representative of the metering zone; compaction can make a laboratory value unrepresentative.
  • What does a negative delta mean? The fixed volumetric setting delivers less mass than the required setpoint at the entered density.
  • Is the required volume an equipment setting? It is a volume-flow requirement. Convert it to a setting using a qualified material-specific feeder test.

Last reviewed 2026-10-12.