Manufacturing Economy Monitor
Manufacturing Movers: Who Is Growing, Who Is Shrinking
Among U.S. manufacturing industries, other transportation equipment is growing fastest at +11.9% year over year in value added (2025). while petroleum and coal products is falling fastest at -15.3%. Across states, Washington leads manufacturing growth at +4.8%. Full gainer and loser rankings for all 19 industries and the 50 states and DC are below, from U.S. Bureau of Economic Analysis data.
Fastest-growing industries
- Other Transportation Equipment: +11.9% year over year (2025).
- Computer and Electronic Products: +7.8% year over year (2025).
- Electrical Equipment and Appliances: +5.8% year over year (2025).
- Chemical Products: +5.6% year over year (2025).
- Paper Products: +2.8% year over year (2025).
- Miscellaneous Manufacturing: +1.7% year over year (2025).
- Furniture and Related Products: +1.4% year over year (2025).
- Fabricated Metal Products: +1.3% year over year (2025).
Fastest-shrinking industries
- Petroleum and Coal Products: -15.3% year over year (2025).
- Motor Vehicles and Parts: -3.0% year over year (2025).
- Food, Beverage, and Tobacco Products: -1.6% year over year (2025).
- Plastics and Rubber Products: -1.5% year over year (2025).
- Primary Metals: -1.0% year over year (2025).
- Apparel and Leather Products: -0.8% year over year (2025).
Fastest-growing states
- Washington: +4.8% year over year (2025).
- Florida: +4.6% year over year (2025).
- Connecticut: +4.6% year over year (2025).
- Maryland: +4.3% year over year (2025).
- Idaho: +4.1% year over year (2025).
- California: +3.7% year over year (2025).
- North Carolina: +3.7% year over year (2025).
- Virginia: +3.7% year over year (2025).
Fastest-shrinking states
- Montana: -8.9% year over year (2025).
- Wyoming: -5.3% year over year (2025).
- North Dakota: -3.4% year over year (2025).
- Hawaii: -2.8% year over year (2025).
- Michigan: -2.1% year over year (2025).
- District of Columbia: -1.6% year over year (2025).
- Nebraska: -1.2% year over year (2025).
- Kentucky: -1.0% year over year (2025).
Frequently asked questions
- Which U.S. manufacturing industry is growing fastest? The fastest-growing manufacturing industries by year-over-year value added are other transportation equipment (+11.9%), computer and electronic products (+7.8%), electrical equipment and appliances (+5.8%). Growth is measured in nominal value added from BEA GDP-by-industry data.
- Which manufacturing industries are shrinking? The industries with the steepest year-over-year declines in value added are petroleum and coal products (-15.3%), motor vehicles and parts (-3.0%), food, beverage, and tobacco products (-1.6%). Each industry has its own live page with the full quarterly history.
- Which states have the fastest-growing manufacturing? By year-over-year manufacturing GDP, the fastest-growing states are Washington (+4.8%), Florida (+4.6%), Connecticut (+4.6%). The full ranking of all 50 states and DC, gainers and losers, is above.
About this data
- Source: U.S. Bureau of Economic Analysis (public domain). National quarterly values are seasonally adjusted annual rates. Corporate-profit industry detail reflects inventory valuation adjustment without capital consumption adjustment, per NIPA table 6.16D conventions.
Last reviewed 2026-10-01.